How to calculate Capacity utilization

The Capacity utilization formula, with plain worked examples you can check yourself.

Capacity utilization = A ÷ C × 100

The result is a percentage (%).

Worked examples

A = 540 · C = 900Capacity utilization = 60%
A = 300 · C = 400Capacity utilization = 75%
A = 600 · C = 800Capacity utilization = 75%

How to use it

  1. Write down the values for each letter in the formula.
  2. Do the brackets first, then divide or multiply.
  3. Multiply by 100 to show the answer as a percentage.
  4. Compare the answer with last period or with a competitor to see if it is good or bad.

This formula belongs to Operations.